Grassmasters MTLGrassmasters MTL
Built to last

Hardscaping

Patios, walkways, retaining walls and stone features engineered for Montreal freeze-thaw cycles. Proper base, polymeric jointing and clean finishes.

Montreal winters are hard on hardscaping that's built on shortcuts — that's why every patio, walkway or retaining wall we install starts with a properly excavated, frost-rated compacted base. Pavers are set true and level, joints are filled with polymeric sand to lock everything in place, and edges are restrained so nothing shifts after the first freeze-thaw cycle. Backed by manufacturer warranties, it's built to look as good in ten years as it does the day we finish.

  • Frost-rated base
  • Polymeric joints
  • Manufacturer warranty
  • Custom designs
How long does a paver patio take?

Most residential patios are completed in 2 to 5 days depending on size and design.

Hardscaping
CallGet Free Quote