Grassmasters MTLGrassmasters MTL
Instant lawn

Sod Installation

Premium fresh-cut sod delivered and installed the same day. We prep the soil, level the base and lay each strip tight-seamed for a seamless, magazine-cover finish.

Every sod installation starts with a proper site visit — we check drainage, soil quality and sun exposure before quoting, so there are no surprises on install day. Old turf or bare soil is graded and levelled, a starter fertilizer is worked in, and fresh-cut sod is laid within hours of harvest for maximum root take. The result is a lawn that looks finished the moment we leave, and gets stronger every week after.

  • Instant curb appeal
  • Weed-free start
  • Tight, invisible seams
  • Rooted in 2–3 weeks
How much watering does new sod need?

Water twice daily for the first 10 days, then taper as roots establish over 4–6 weeks.

Can I walk on it right away?

Light foot traffic is fine after 10–14 days. Wait 4 weeks for regular use.

Sod Installation
CallGet Free Quote